Description
Cell board balancing:
Resistor on the cell boards is switched on at
- Cell voltage > Shunt voltage AND current < 10A
- The shunt voltage (UShunt) can be set between 3.40V and 4.00V via the menu
- Recommended basic setting Ushunt is 3.48V
Dimensions: 98 x 27.5 x 77 mm
Temperature measurement for cell boards with temperature sensor from software version V7.0
Measurement of the cell temperature with sensor on the cell board:
The measurement of the cell temperature is primarily used to control the air conditioning (heating, cooling) of the cells.
Tol. of the measurement: +/- 3K
Switching thresholds on relay with address 232 “Heating/air conditioning”:
< 5°C “on” > 8°C “off”
Please note during installation:
After placing the cell connectors on the poles, the cell boards are screwed onto the cell connectors. To ensure a secure contact, we recommend securing the cell connector with a threaded bolt, washer and nut. The cell board is then mounted on the cell connector. It is essential to ensure that the polarity of the cell and the cell board match (+ and – polarity is marked on the board)! The cell board must not lie directly on the connector, the resistor is located on the back. Otherwise this can be damaged under certain circumstances; we accept no liability for damage caused by disregarding this.
Additional information
Weight | 0,01 kg |
---|
Description
Cell board balancing:
Resistor on the cell boards is switched on at
- Cell voltage > Shunt voltage AND current < 10A
- The shunt voltage (UShunt) can be set between 3.40V and 4.00V via the menu
- Recommended basic setting Ushunt is 3.48V
Dimensions: 98 x 27.5 x 77 mm
Temperature measurement for cell boards with temperature sensor from software version V7.0
Measurement of the cell temperature with sensor on the cell board:
The measurement of the cell temperature is primarily used to control the air conditioning (heating, cooling) of the cells.
Tol. of the measurement: +/- 3K
Switching thresholds on relay with address 232 “Heating/air conditioning”:
< 5°C “on” > 8°C “off”
Please note during installation:
After placing the cell connectors on the poles, the cell boards are screwed onto the cell connectors. To ensure a secure contact, we recommend securing the cell connector with a threaded bolt, washer and nut. The cell board is then mounted on the cell connector. It is essential to ensure that the polarity of the cell and the cell board match (+ and – polarity is marked on the board)! The cell board must not lie directly on the connector, the resistor is located on the back. Otherwise this can be damaged under certain circumstances; we accept no liability for damage caused by disregarding this.
Additional information
Weight | 0,01 kg |
---|
This might also interest you…
75,01 € incl. VAT & plus shipping costs
63.03€ Incl. 0% VAT plus shipping costs for orders pursuant to §12 para. 3 VAT Act (Zero Tax Rate)
50,00 € incl. VAT & plus shipping costs
42.02€ Incl. 0% VAT plus shipping costs for orders pursuant to §12 para. 3 VAT Act (Zero Tax Rate)
Original price was: 49,49 €.44,99 €Current price is: 44,99 €. incl. VAT & plus shipping costs
37.81€ Incl. 0% VAT plus shipping costs for orders pursuant to §12 para. 3 VAT Act (Zero Tax Rate)
9% Off
Original price was: 680,00 €.471,24 €Current price is: 471,24 €. incl. VAT & plus shipping costs
396€ Incl. 0% VAT plus shipping costs for orders pursuant to §12 para. 3 VAT Act (Zero Tax Rate)
31% Off